Melbourne Sunshine Power Co., Ltd

Project Name: Clean Room, Constant Temperature and Humidity Area Air Conditioning and Decoration Engineering for Sunshine Power Plant No.5
Project area: over 12000 square meters
Project Introduction: This project is the clean workshop construction and decoration project of the fourth and fifth construction projects of the new energy power generation complete equipment manufacturing base phase II project of Sunshine Power Co., Ltd. (including clean air conditioning system, exhaust gas treatment system, walls, ceilings, PVC anti-static floor, dressing room, wardrobe and wardrobe exhaust, air shower room, ESD gate, workshop lighting, strong and weak electricity sockets, doors, observation windows, fire protection, emergency lighting renovation, installation, etc.), as well as the wall, roof, anti-static epoxy floor construction, decoration, and air conditioning system equipment procurement and installation of the constant temperature and humidity area project. The total cost is over 30 million yuan. At present, the project has been accepted and delivered for use.